Outlet & Device Locations
Map data and voice drops, endpoint locations, cable types, and identifiers to the floor plan.
Low-Voltage
Structured cabling, fiber, pathways, and organized equipment rooms. Kortech designs and installs the physical connections behind your business, from the first outlet location to the final test report.
Low-VoltageDesign Before the Pull
Good cabling starts before installation. We review floor plans, walk the site, and coordinate with your team to identify device locations, cable routes, equipment rooms, and construction constraints.
The result is a defined installation scope that gives the field crew a clear plan and gives you a record of what is being built.
Map data and voice drops, endpoint locations, cable types, and identifiers to the floor plan.
Plan support routes, risers, sleeves, and access requirements. Coordinate penetrations and trade responsibilities before work starts.
Lay out cabinets, patch panels, fiber enclosures, and cable management, with space for service access and future additions.
Define drop counts, materials, test requirements, labeling, and handoff documents around your project schedule.

Low-Voltage Installation
New construction, occupied spaces, renovations, and additions. We plan the work around the building and the people using it.
Cat6 and Cat6A data and voice runs, terminated at outlets and patch panels with consistent labeling at both ends.
Includes cable routing, termination, patch-panel organization, and test records.
Single-mode and multimode fiber for risers, equipment-room connections, and building-to-building links.
Plan fiber type, strand count, termination locations, splice work, and testing for the project.
Cable tray, ladder rack, and support systems that keep routes organized and accessible.
Coordinate pathway capacity, ceiling access, sleeves, and penetrations with the project team.
Racks, cabinets, patch panels, fiber enclosures, and horizontal and vertical cable management.
Use rack layouts and port assignments to keep equipment-room installations serviceable.
Dedicated low-voltage runs for phones, access points, cameras, access-control equipment, AV, and paging.
Coordinate cable requirements and endpoint locations with the equipment and system design.
Trace existing runs, resolve labeling gaps, re-terminate cabling, and reorganize congested racks.
Agree on outage windows and cutover sequencing before touching active connections.

Field Coordination
We coordinate cable pulls, access to occupied areas, and equipment-room work with your facilities team, general contractor, and other trades.
Testing & Documentation
We use Fluke Networks cable analyzers to document copper cabling performance against the project’s specified test requirements. Fiber testing is defined around the installed link and project scope.
Cable IDs should connect the outlet, patch panel, drawing, and test record. That makes it easier to locate a connection, review its results, and maintain the installation later.
Deliverables defined in the installation scope:
Before & after
Drag the slider, or use the arrow keys, to compare a rack before and after a Kortech cleanup and re-termination.



How We Work
Review floor plans, inspect existing conditions, and identify project requirements.
Define outlet locations, cable routes, equipment-room layouts, materials, and scope.
Pull, support, terminate, label, and dress the cabling to the agreed plan.
Complete the agreed testing, reconcile field changes, and deliver project records.
Let’s Plan the Physical Layer
Tell us about the property, device locations, and project timeline. We will help define the design, installation, and handoff requirements.